📬 ← Return to Winlink Operations Dashboard
🏛️ Brunswick County EmComm Winlink Net — Session #003
- Net Session Start: Monday, October 6th at 12:01 A.M.
- Net Session End: Saturday, October 18th at 11:59 P.M.
- Designated Net Control Station (NCS): Send your completed Winlink package parameters directly to
K1MJJ(orK1MJJ@winlink.org).
🎯 Training Objectives
- Launch and execute browser-driven internal Winlink templates (ICS 213RR.txt)..
- Follow the instructions in Exercise 003 to create the message you will send in the ICS 213RR message.
- Check your work.
- Successfully send the Winlink message to the Winlink NCS.
🛠️ Assigned Task Flow
To successfully fulfill the operational checklist for this net session, you must execute your deployment using the detailed briefing parameters provided by the Net Control Station.
- Download and Review Instructions: Open the official exercise PDF document using the link provided directly below.
- Execute the Form Scenario: Follow the step-by-step instructions inside the PDF document to complete the exercise.
- Transmit Message: Send your Winlink message over your chosen Winlink session to
K1MJJ.
📥 Download Complete Exercise #003 Briefing Guide (PDF) →
🙋 Technical Assistance & Inquiries
If you encounter software configuration issues, template freezing faults, or need general assistance navigating the standard forms tree directories, please route a support message directly over to Bob at K1MJJ.Ham@gmail.com .
Good luck! Have fun and learn from this Winlink exercise.
This page last revised: 10/6/2025
